Discover
Waves
Decks
Login
Discover
Waves
Decks
Buy perks
Login
Signup
50
igb
Igor Bogdanov
Pentarchitecture
Available
Used
Resource Credits
3 Followers
3 Following
Bali
July 20, 2021
RSS feed
Blog
Blog
Posts
Comments
Communities
Wallet
Mute
Center
igb
bungalow
3y
Follow Bungalow construction here:
$ 0.000
1
igb
degree108
3y
20210710 Bungalow construction (108 degrees) - day 4
Today's Saturday July 10th 2021. Wooden sticks are quickly hammered in the ground and horizontals are swiftly cut to size and nailed to the poles. Adjustments executed on the fly. The floor of the future
$ 0.343
2
igb
pentagon
3y
20210709 Bungalow construction (drawing pentagons) - day 3
Drawing isosceles pentagons at scale 1 on an uneven terrain presents an interesting set of challenges. We try several methods. Here, we're making lines of the same length to create a constant which helps
$ 0.351
2
igb
bali
3y
20210708 Bungalow construction (drawing pentagons) - day 2
We shift some of the pentagons to include as many existing trees as possible in the design. Pentagonal shapes of the structure are delineated with ropes. Unfortunately a couple of trees have to go to create
$ 0.357
2
igb
architecture
3y
20210707 Bungalow construction (ceremony) - first day
As many things in Bali, it starts with a ceremony. This July 7th is supposed to be an auspicious day to begin construction. Immediately after the ceremony, preparation for the layout is under way.
$ 0.361
3
2