igb
Pentarchitecture
3y
20211207 Bungalow construction (door lock reference) - day 154
References and ideas for the door lock mechanism that Arie and his crew are working on
$ 0.000
0
igb
Pentarchitecture
3y
20211203 Bungalow construction (bedroom shutters) - day 150
Each of the 8 bedroom windows gets a wooden shutter. Shutters are installed inside. Custom metal hinges made by Arie and crew connect wood board to metal frame.
$ 0.000
1
igb
Pentarchitecture
3y
20211201 Bungalow construction (workshop steps) - day 148
Fabrication of the steps to access to workshop Sanggah temple intersecting steps bring tight interaction between the two structures.
$ 0.000
1
igb
Pentarchitecture
3y
20211129 Bungalow construction (water well digging complete) - day 146
The boring of the well which started 40 days ago is finally complete. Water tested at a depth of 60 meters was plentiful and high quality.
$ 0.000
0
igb
Pentarchitecture
3y
20211128 Bungalow construction (ceiling fixtures) - day 145
Ceiling fans and spotlights Main space Bedroom Bedroom electrical panel
$ 0.000
0
igb
Pentarchitecture
3y
20211126 Bungalow construction (Trimdek walls) - day 143
Inside the main space East swing wall. This entire wall swings open to offer an unobstructed view of the rice fields. West swing wall. This entire wall swings open onto the floating terrace and more rice
$ 0.063
2
igb
Pentarchitecture
3y
20211124 Bungalow construction (Sanggah temple complete) - day 141
The Sanggah temple is complete. It is made of concrete, bricks and plastered with cement mixed with black sand from the nearby beach following the local tradition.
$ 0.000
0
igb
Pentarchitecture
3y
20211123 Bungalow construction (outdoor light fixtures) - day 140
Installation and test of 20 exterior light fixtures on two bungalows.
$ 0.164
7
igb
Pentarchitecture
3y
20211121 Bungalow construction (cement tiles) - day 138
The cement tiles that we designed and produced a couple of months ago are now being installed on the toilet walls of both bathrooms.
$ 0.176
7
igb
Pentarchitecture
3y
20211119 Bungalow construction (window glass install) - day 136
Glass is being installed today on 8 bedroom windows.
$ 0.137
6
igb
Pentarchitecture
3y
20211116 Bungalow construction (Sanggah temple progress) - day 133
Prepping for the fabrication of the top part of the temple Working on the last structural element. Temple is complete. Last step is to plaster it. The temple gets a coat of cement mixed with black sand
$ 0.349
11
1
igb
Pentarchitecture
3y
20211113 Bungalow construction (kitchen pantry) - day 130
Pantry side walls are made of reinforced concrete The back wall is cement plastered. Direct connection from cement plaster to metal column. Back wall is finished with smooth render. Side wall are left
$ 0.204
9
igb
Pentarchitecture
3y
20211111 Bungalow construction (Trimdeck walls) - day 128
Installation of the Trimdek on the metal frames of the walls of the main space has started. It I the same marterial that we used on the roof Metal frame visible from the inside The horizontal open space
$ 0.187
9
igb
Pentarchitecture
3y
20211110 Bungalow construction (rounded corners) - day 127
All cement and concrete walls have 2cm radius rounded corners. Bedroom. Unfinished wall. Workshop. Finished wall.
$ 0.181
9
igb
Pentarchitecture
3y
20211109 Bungalow construction (door lock) - day 126
Today Arie is showing us progress on the there-point locking system that he's been working on for entrance doors. Designing and building this system has been challenging but the current version shows much
$ 0.000
1
igb
Pentarchitecture
3y
20211108 Bungalow construction (electrical fixtures placement) - day 125
We're almost at the stage where we can install electrical fixtures. Since many fixtures are installed following pentagonal symmetry, we're guiding the crew to install one of each fixtures so they will
$ 0.168
9
igb
Pentarchitecture
3y
20211107 Bungalow construction (new well drill) - day 124
We had been warned by the locals that it would be challenging to drill a water well. The underground in the is area of Bali is composed of several types of rocks at different levels. We had uneven progress
$ 0.000
0
igb
Pentarchitecture
3y
20211106 Bungalow construction (bedroom wall textured finish) - day 123
The first wall finish sample is not conclusive. They did a lazure with vertical strikes which is not what we are looking for. In order to give better directions I ask to have the workers make the wall
$ 0.168
12
igb
Pentarchitecture
3y
20211105 Bungalow construction (outdoor light fixture) - day 122
We're trying to hire local artisans as often as possible. It is not uncommon to have discrepancies between the original design and the result. In the case of those outdoor lights, much is lost in translation
$ 0.000
0
igb
Pentarchitecture
3y
20211104 Bungalow construction (bedroom shutters) - day 121
The wood for the bedroom shutters is going stay natural. We keep the stains and the marks of time. After gentle sanding, planks will be treated against termites then brushed with a synthetic wax typically
$ 0.000
0