Discover
Waves
Decks
Login
Discover
Waves
Decks
Buy perks
Login
Signup
53
chrismiller
Chris M
Window Installer
Available
Used
Resource Credits
910 Followers
240 Following
Australia
June 17, 2017
RSS feed
Posts
Blog
Posts
Comments
Communities
Wallet
Mute
chrismiller
work
7y
Worst Monday In Long Time
Today was a long day. Got to the job site and had to park about 1km from the job site. When we got there, everything was a big mess. All the contractors before just left all their rubbish everywhere. If
$ 17.672
12
4
chrismiller
worksite
7y
Prestons Again. Need It Finished By Tomorrow 5 pm.
This is the site at Prestons again. The guys here yesterday didn't finish the job so now me and my mate have to finish it all by tomorrow 5pm. Get it all ready for all the frames. Lunch break now, so I
$ 7.468
20
1
chrismiller
photo
7y
Photo Of Building That 6 Of Us Are Working On Today.
There are 6 of us working on the windows here today. Have a look at this photo I think I might become a part time photographer. When you see this building in Sydney remember that I helped make it. here
$ 3.044
8
chrismiller
windowinstaller
7y
Installing Cover Plates
It is too hot today and I have to work on the scissor lift all day. We are installing cover plates on this building in Marsden Park. Took a short break.
$ 5.993
8
1
chrismiller
work
7y
Today Was A Busy Day. Took Photos Of Things I Worked On.
Today we were doing a lot of little jobs. 25 subseals, frame repairs, unloading trucks of frames and glass. Look at this, I am happy that my foot was not there when it fell. Cheers
$ 13.629
13
3
2
chrismiller
photo
7y
Only 25 Subseals To Install.
Today is overtime! We are in Prestons today at a building that is going to be all in windows. We only have 25 subseals to install, enough work for 5 people not just 2 of us. We will do our best to install
$ 8.837
14
2
chrismiller
photo
7y
See What I See!
Have a look at what I see from my workplace. Nice views?
$ 10.270
10
3
chrismiller
work
7y
Long day today, all by myself and too much to do.
Sometimes the job is fun, sometimes the day never ends. Today I was by myself all day in this building I did more by myself then if we had 3 of us here. But it was a long and slow day. Some other guys
$ 5.213
10
2
chrismiller
work
7y
5 Guys Installing 20 Windows!
I took some quick photos to show you the windows that we are installing and for you to see how big this job. that is 1 window! need to finish 20 like this one, today. Here are my mates Will not come home
$ 4.921
10
1
chrismiller
windowinstaller
7y
Lunch Break Post!
Today we are at St Clair again, I am on the scissor lift on the outside of the building and my mate is inside. We are installing window brackets and drilling into the steel construction. The steel is that
$ 12.933
17
1
chrismiller
work
7y
Look At The Views I Have At My Job!
Look at the view! This my mate, we have to get as much of these windows all ready for installation of glass. Monday again. At least today we don't have anybody here to get in our way so we can get a lot
$ 10.105
10
1
1
chrismiller
work
7y
Wrong Plans, Wrong Frames and One Day To Get The Job Done.
Got to the job site today, the plans given to me in the morning were the wrong plans for this site, the foreman at the site gave me the building plans but he does not have the window plans. So I have to
$ 4.360
11
chrismiller
photo
7y
My Little Brother The Fisherman
My little brother got a tackle box and a fishing bag from our dad and today I helped him fill his tackle box up with fishing gear. He was so happy! So today when I came home from work I took him to the
$ 6.806
18
6
3
chrismiller
work
7y
Worked all day and got home after 9pm.
Today we worked at the site all day, tried to get as much as possible done today so that tomorrow we can start with the installing of glass. It was a very long day, was up and down on the scissor lift
$ 5.412
13
chrismiller
work
7y
Cleaning Up And Finfishing Off What Others Didn't Do.
Today we are in St Clair and the two of us at this site have to finish off everything others didn't do, fix up all their stuff that they did wrong and then start installing all the glass. So today is going
$ 4.926
8
chrismiller
photo
7y
Monday Morning
If you like to see how it looks for a worker at the building site on Monday morning, here it is. Very exciting. So much to see, so I took a selfie in the car mirror! See, Monday morning, I don't think
$ 3.524
8
chrismiller
work
7y
I am helping to make this building. Good feeling.
When I see the building getting finished it is a good feeling. When I go past buildings I worked on I think to myself "I helped make this building". Good feeling!
$ 3.571
7
chrismiller
work
7y
Very long day already.
Today is going to be a very long day at the jobsite. Look, not even a dog walking anywhere. Ghost town. To make it more interesting the guy I am working with is almost a pensioner and he speaks very little
$ 2.866
6
1
chrismiller
work
7y
Must Be Finished By 11:00am Tomorrow.
Boss said that all frames must be installed by tomorrow 11:00am. When we got to the worksite today and unloaded our tools We had a site to see Heavy frames, 3.5 x 2.7 m each. We will do our best to get
$ 3.369
6
chrismiller
jobsite
7y
Monday Morning At Job Site.
A new week, Monday morning. Arrived at our job site. These guys are doing gyprock so we will get back to these windows later, need to install the glass here. Here are frames that I installed last week,
$ 3.516
10
Center