ULOG: overcome the occurrence of flooding

20181010_101856.jpg
in the manufacture of irrigation networks must be in accordance with the regulations of the irrigation standards in 2006 so that it can produce channel dimensions according to the type of channel we will work on
20181010_104002.jpg
in irrigation the land elevation channel must pay close attention so that the flow of water can function so as not to cause flooding of the population around the irrigation canal ...
in determining the elvation channel there are several things that we must work on such as determining the benchmark and size that will be done in carrying out the work of irrigation channels and swimming pools and swimming pools must be connected to tertara in the current regulations very severe air flow does not occur collapsed on the walls of the canal
20181004_110526.jpg

with the formation of irrigation channels, it is expected that it can be useful for the surrounding residents to facilitate the flow of water around the irrigation channels20181004_105801.jpg
20181001_130833.jpg