RE: RE: New Tappan Zee Bridge Construction Update P.4 on 1/10/2018
You are viewing a single comment's thread from:

RE: New Tappan Zee Bridge Construction Update P.4 on 1/10/2018

RE: New Tappan Zee Bridge Construction Update P.4 on 1/10/2018

Look at the distance between supports on the new bridge vs. the old bridge due to tremendous advances in material strength. Also, note they are running 8 lanes of traffic on the first new span. If they ever needed to they could run 16 lanes once both spans are open.

H2
H3
H4
3 columns
2 columns
1 column
Join the conversation now
Logo
Center