Creative-sunday :- Pegging and Digging of Twice Flat of a Room and Parlor Self Contain

Welcome to my blog, it's a pleasure to show my creativity as touching my expertise in Buidling Construction, it is also an opportunity for me to see and learn from the writeups from my fellow Hivers on the Blockchain through their creative posts. I Am glad it's another Sunday to share my own content for this week Creativity-Sunday, it is about the work I did this weekend.

IMG_20221105_120747.jpg

IMG_20221105_120754.jpg

If you are conversant with my blog you would know I do worte about my handwork which is Masonry, I am into Building Contractor works. So my post for this Sunday won't be any difference, it is about Pegging and Digging of a Two Flat of a Room And palor Self Contain, this is what I wanted to use as my entry into the Creativity-Sunday Initiative.

IMG_20221105_120832.jpg

I would like you to stay tuned as I put you through the step by step of how we got the work done, but first I will list below the tools we used.

IMG_20221105_121316.jpg

IMG_20221105_121201.jpg

TOOLS USED

Pegging Wood/Iron
Measuring Tape
Shovels
Digger
Lining Rope
Bricks

IMG_20221105_120810.jpg

PEGGING

First we measured with Measuring Tape a distance of 6ft away from the fence at the two edge of the building, this is so that there will be space behind the building when the house is completed. Next was to measure out the remaining three edges of the building. The size of the building is 29ft by 24ft.

IMG_20221105_120851.jpg

IMG_20221105_120948.jpg

The Palors in the two flat are 14ft by 10ft, Bedrooms are 10ft by 10ft, Toilet is 4ft by 6ft and the kitchen are 4 ft by 6ft and there is a corridor in between the palor and bedroom that serves as a lobby for easy passage in-between the palor and bedroom. This is line up to link the four edge of the building to make sure it is rightly placed, this is verified with the aid of a SQUARE.</div

IMG_20221105_120913.jpg

DIGGING

That been said the next thing to do after rounding up with the pegging was the Digging proper . A line rope is used to link the part that will dugged and with the use of a Digger, we dug the ground and the heaps is packed with the use of the Shovels.

IMG_20221105_121115.jpg

IMG_20221105_121050.jpg

This is my writeup for these week creative Sunday which entails the digging and pegging of a twince flat of a room and parlor self contain, the work will continue this new week, I hope to creat another content as the work progresses. Thanks, happy new week